Steel Frame Extension
A medium sized project to manufacture and install a hot dip galvanized chiller platform on the roof of a 5 story building.
​
We began the project by providing 3D drawings of the project to our customer who approved the design before manufacture.
​
Once we had received approval we proceeded to manufacture the steelwork using manufacturing drawings produced by Advanced Steel.
​
We sent the steelwork to be galvanised and delivered to site on a Hiab lorry. Upon arrival, the steels were craned onto the roof and laid in position ready for our site team to begin installation.
​
Section by section the frame was installed, using the isometric drawings to ensure all steelwork was correctly positioned.
​
We finished the project with an open grid flooring and balustrade.
​
From receipt of order to completion on site, this project took us around four months, including all design, manufacture, galvanising, deliveries and installation.